Close the loop on the prototype
After the customer evaluates a sample, record the accepted changes and unresolved issues. Distinguish a suggestion from an approved drawing change. A successful assembly trial should not silently override a material or inspection requirement.
Agree on the production baseline
Confirm the component drawings, assembly drawing, materials, treatments and inspection criteria for the next order. If the prototype used temporary arrangements, identify them explicitly. The purpose is to make the next batch repeat the agreed design, not an undocumented workshop workaround.
Define what can change
A new revision, a revised mating component or a changed acceptance method can affect manufacturing and assembly. Discuss these changes before the next run and update the instructions and reporting scope together.
Keep quantity and delivery expectations explicit
Share the next batch size and the expected recurring demand. DOYOKU accepts single samples, small trial orders, small batches and ongoing production. Lead times and quantities are reviewed for the specific project; no universal delivery promise replaces that discussion.
Editorial status: source-checked guidance. Project-specific engineering review is still required.
Process guidance based on DOYOKU’s confirmed service scope.