Separate the inspection characteristics
A size tolerance, runout requirement and coaxiality requirement describe different characteristics. One result should not be substituted for another without an agreed basis. Keep the drawing terminology, datum references and report headings consistent.
State how the assembled part is evaluated
Part-level inspection and assembly inspection answer different questions. Agree on the assembled condition, locating references and measurement points for overall static accuracy. This avoids comparing reports made with different assumptions.
Ask for evidence aligned with acceptance
DOYOKU provides material, heat-treatment and dimensional/assembly reports. The dimensional group can cover tolerances, runout, coaxiality and overall static accuracy, as agreed. A detailed report is most useful when its items correspond to the requirements the customer actually uses for acceptance.
Distinguish static checks from running performance
Static dimensional acceptance does not itself demonstrate torque-speed capability, thermal behavior or operating life of a complete powered joint. Those require separately defined system-level evaluation. Keep the scope clear when planning verification and making claims.
Editorial status: source-checked guidance. Project-specific engineering review is still required.